Overview
-
Start date: Spring 2027
-
Target sections:
-
Keihin-Tohoku/Negishi Line: Omiya – Minami-Urawa, Kamata – Ofuna
-
Chuo/Sobu Line (Local): Mitaka – Chiba
-
Safety Enhancements
-
Installation of boarding confirmation monitors in the driver’s cab
-
Introduction of a direct communication system between the transport control center and passengers
-
Implementation of a system allowing in-train announcements from the transport control center
-
Strengthened training and education for staff
Transport Stability Measures
-
Installation of TASC (Train Automatic Stop Controller) to reduce driver workload
-
Introduction of ATO (Automatic Train Operation) on 10-car E233 series trains running on the Keihin-Tohoku/Negishi Line to further enhance transport stability